Main Navigation
Main Content
Please use the search tools below to browse some of our customers and projects.
Reset
We installed the HVAC, plumbing, and sprinkler systems in this a AAA office tower in downtown Vancouver.
We provided the sustainable HVAC, plumbing, and sprinkler systems for MEC’s LEED Platinum headquarters in Vancouver.
Our plan to retrofit 19 AHUs at one KRP business campus resulted in a quarter-million-dollar incentive and will save KRP ~$120,000 in energy costs.
Modern is installing all HVAC and plumbing systems for this new, 230,000 sq. ft. commercial complex.
We provided all mechanical services for this 35-storey office tower in a challenging downtown location.
We are providing all mechanical services for this downtown Regina office tower with ground-floor retail space.
Modern Niagara was the prime mechanical contractor on this challenging project and performed all plumbing and heating work as well as managed the subcontracting of sheet metal, insulation, and firestop.
We provided all plumbing, HVAC, and fire protection for this new 25-storey office tower situated in the prestigious Eau Claire district of downtown Calgary.
We provided the complete HVAC, plumbing, and building control systems for Minto’s Building I, a 6-storey Class-A office building that achieved LEED Gold designation.
We provided all mechanical elements for this new 2nd floor office space, including heat pumps, kitchen facilities, and an air conditioning system for Bloomberg’s mission-critical computer server operations in Calgary.
We provided all mechanical elements for this new commercial office space, including heat pumps, kitchenettes, an HVAC distribution system, and computer lab air conditioning system.
Modern Niagara’s HVAC Services and Building Controls capabilities combined to deliver $40,000 per year in savings for this building.
We are part of a building retrofit to update the building systems and efficiency at the Salvation Army Headquarters office tower in Toronto.
Our upgraded heating system and building automation solution has reduced the CPhA’s energy consumption costs by 21% in Winter months, and 41% in Summer months.
We are the General Contractor and the mechanical contractor for upgrades at the Alberta Workers’ Compensation Board facilities.
The Building Control system we designed and installed for Morguard’s Telesat property paid for itself in just 8 months, and won Distech Controls’ Greenest Building Award in 2014.
We provided construction and mechanical elements for the renovation of this remote recreational building.
A mixed-use development, this is the first high-rise office building in Canada to be pre-certified in the Leadership in Energy and Environmental Design for Core and Shell (LEED-CS) construction standard.
We supplied and installed all of the mechanical services, plumbing, HVAC, fire protection, and building controls for this complex renovation project.
We provided all mechanical elements for the construction of this mixed-use property that includes retail, commercial, and residential space in a downtown location.
We provided all mechanical elements for this 26-storey office tower with ground-floor retail, including plumbing, sheet metal, insulation, balancing, building controls, and sprinkler system.
This 50-storey office tower in downtown Toronto achieved LEED Gold certification.